Nador’s New 20,000-Seat Stadium: A Landmark Project Inspired by the Mediterranean and Marchica Lagoon

Nador’s new stadium project is set to deliver a modern sports venue with a seating capacity of 20,000 spectators, built on a site spanning more than 18 hectares. The project features an integrated range of sporting, technical, and administrative facilities, alongside dedicated spaces for media professionals, hospitality, and spectators.

Located at the entrance to Nador, near the Airport District and Marchica Lagoon, the stadium benefits from its proximity to major road connections and occupies a strategic position within the city’s urban landscape, welcoming visitors arriving in Nador.

The land allocated to the project covers approximately 185,829 square meters, equivalent to around 18.6 hectares, according to details presented by 11Lions, a media outlet specializing in sports and infrastructure.

An Architectural Design Inspired by the Sea and Marchica Lagoon

The stadium’s exterior is characterized by an oval, fluid architectural form. Its façade wraps around the structure in a continuous composition, moving away from traditional designs dominated by sharp angles and flat surfaces.

The outer shell features repeating, interlocking oval elements. These details evoke fish scales, a familiar feature of Nador’s coastal identity, while also resembling the overlapping feathers of flamingos found around Marchica Lagoon.

The façade combines dark blue, light blue, white, and grey tones, drawing inspiration from the city’s Mediterranean environment. Its appearance is expected to vary depending on viewing angles and the way sunlight reflects off its individual components.

The roof further reinforces the stadium’s architectural identity. It features a broad oval covering with gradual curves extending over the stands, appearing as a white ring surrounding the upper section of the stadium and complementing the multicolored façade.

Fully Covered Stands with a Capacity of 20,000 Spectators

The design предусматриes a total capacity of 20,000 seats, with all spectator seating covered. The seating breakdown includes:
  • 19,090 general spectator seats

  • 300 VIP seats

  • 50 VVIP seats

  • 200 seats in private suites

  • 150 seats for media representatives

  • 30 seats for officials

The stadium will also provide 180 spaces for people with reduced mobility, which are included within the overall capacity rather than added to it.

According to the specifications, standard seats must be at least 45 centimeters wide, with an 80-centimeter distance between consecutive seatbacks and a minimum seatback height of 30 centimeters.

VIP seats will have a minimum width of 60 centimeters and include armrests. The first row of seats will be positioned between two and three meters above the pitch level.

The spectator stands will be divided into at least four independent sections, allowing for better management of entrances, exits, and the distribution of services throughout the venue.

Natural Grass Pitch and Dedicated Facilities for Players and Referees

The playing field will measure 105 meters in length and 68 meters in width and will feature natural grass. An additional grass strip will extend four meters along both touchlines and five meters behind each goal.

A minimum nine-meter space will separate the pitch boundaries from the stands, allowing movement for players, referees, photographers, maintenance teams, and emergency personnel.

The project includes two separate covered team benches, each accommodating 22 people and providing protection against weather conditions.

A dedicated players’ tunnel will connect the dressing rooms to the pitch. Measuring 4.5 meters wide and 2.4 meters high, it will feature a telescopic structure designed to protect players and referees as they enter the field.

The stadium will also include four dressing-room complexes identified as A, B, C, and D. Each will cover approximately 145 square meters and include:

  • A 50-square-meter players’ changing area

  • A 20-square-meter coach’s office

  • A 25-square-meter massage room

  • Sanitary facilities

The design further provides two warm-up rooms, each measuring 100 square meters, a 40-square-meter medical clinic, and additional medical facilities.

Other amenities include prayer and ablution spaces, separate facilities for referees and officials, a 16-square-meter Video Assistant Referee (VAR) room, a doping-control room, a waiting area, and other dedicated spaces.

Media, Hospitality, and Spectator Services

Approximately 580 square meters will be allocated to media facilities, including a media center, editorial room, IT room, television interview studio, and commentary room.

The project will also feature a 150-square-meter press conference room with a capacity of approximately 100 people, as well as a 100-square-meter mixed zone designated for post-match interviews with players.

Hospitality facilities will include a VIP area covering approximately 450 square meters and a separate VVIP space measuring 200 square meters.

The stadium will also feature reception areas serving luxury private suites, with these suites accounting for 100 seats included in the overall stadium capacity.

For general spectators, the venue will provide six food and beverage outlets, each covering 30 square meters, alongside 12 sanitary facilities for men and 12 for women.

Additional services will include facilities for people with reduced mobility, first-aid areas, and ticket offices.

The design prioritizes the separation of circulation routes for spectators, players, officials, media personnel, and emergency services, helping improve movement throughout the stadium and reduce congestion between different groups.

Technical Infrastructure, Monitoring, and Safety Systems

The stadium will allocate approximately 1,214 square meters to technical facilities, including electrical transformer and distribution rooms, backup generators, server rooms, and video surveillance systems.

Additional spaces will be dedicated to lighting controls and audiovisual systems. The project will also include two technical rooms for giant screens, each measuring 30 square meters.

The water-storage system will consist of three separate tanks serving different purposes:

  • Natural grass irrigation: 120 cubic meters

  • Potable water: 100 cubic meters

  • Firefighting water: 100 cubic meters

The total storage capacity will therefore reach 320 cubic meters.

The facilities will also include maintenance workshops, storage areas for equipment, machinery and fertilizers, as well as a dedicated office for the natural grass manager.

For safety and emergency management, the stadium will feature a 60-square-meter command and control center, alongside a dedicated office for firefighters.

More Than 895 Parking Spaces and an Estimated Budget of MAD 358 Million

The parking plan предусматриes at least 700 spaces for the general public, in addition to a minimum of 150 spaces for VIP guests and 45 spaces for VVIP guests.

Separate parking areas will also be provided for teams and officials, along with dedicated spaces for ambulances and fire vehicles.

This layout is intended to facilitate access to the stadium while separating spectator traffic from the movement of players, officials, and logistical and emergency services.

The maximum estimated budget for construction has been set at MAD 358 million. This amount covers construction works, equipment, fixed installations, site preparation, and external facilities.

According to 11Lions, this figure represents the estimated financial ceiling outlined in the architectural competition. It should therefore not necessarily be considered the final cost of the project, which may be determined following the completion of studies and contractual procedures.

With these specifications, Nador’s new stadium combines a 20,000-seat capacity, specialized facilities beneath the stands, and extensive technical and service infrastructure. Its architectural design, inspired by the sea and the surrounding Marchica environment, is also expected to give it a distinctive identity closely connected to the city.

The project comes amid wider transformations taking place across the region, alongside developments linked to Marchica Lagoon and the Nador West Med port. It is expected to add a major sporting and architectural dimension to the infrastructure of Nador, the province, and the wider Rif region.


 

Post a Comment

Previous Post Next Post